pool refurbishment case study

Swimming Pool Refurbishment – Fibreglass to Liner Pool Conversion

Executive Summary

Project: Complete Swimming Pool Refurbishment
Location: Cotswolds
Pool type: Outdoor residential pool
Original construction: Fibreglass
New finish: On-site welded liner
Works completed: Plant upgrade, cover, paving etc.
Project duration: 3 months
Completed by: Clearwater Swimming Pools

This case study examines the complete refurbishment and conversion of an existing outdoor fibreglass swimming pool into an on-site welded liner pool, completed within a strict three-month timeframe with no delays.

Rather than removing the existing pool and starting again, Clearwater developed a refurbishment solution that allowed the existing fibreglass pool structure to be retained and adapted to accommodate a new on-site welded liner system. This transformed the appearance and waterproofing of the pool while extending the useful life of the existing structure.

Alongside the fibreglass-to-liner conversion, the project included a complete upgrade of the pool plant equipment, including a new pump, filter, UV unit and chlorinator. The existing stone copings and surrounding paving were carefully lifted, relaid and regrouted to retain the traditional Cotswold character of the property.

A new automatic safety cover and purpose-built cover pit were also incorporated into the refurbishment.

The result was a completely transformed swimming pool combining modern performance, improved reliability and enhanced safety while remaining sympathetic to its traditional Cotswold surroundings.

 

pool refurbishment
pool refurbishment
pool refurbishment
onsite welded liner
onsite welded liner
onsite welded liner
pool refurbishment
pool refurbishment case study

Background Information

The property is situated within a traditional Cotswold setting, characterised by natural stone, established landscaping and carefully considered outdoor spaces.

The existing fibreglass swimming pool had aged and required significant refurbishment to bring it up to modern standards.

The pool area was experiencing several issues, including:

  • Deterioration of the existing fibreglass pool finish
  • Ageing and inefficient plant equipment
  • Movement and wear within the coping stones and surrounding paving
  • Outdated pool safety provisions
  • General deterioration of the pool area over time

The client wanted to retain the existing swimming pool wherever practical rather than undertake a complete demolition and replacement.

Clearwater therefore developed a refurbishment programme centred around converting the existing fibreglass swimming pool into a liner pool while simultaneously upgrading the associated equipment and surrounding finishes.


Problem Identification

The key challenges identified at the beginning of the project included:

  • Deterioration of the existing fibreglass internal finish
  • Requirement to adapt the existing pool to accept a liner system
  • Ensuring the refurbished pool provided reliable long-term waterproofing
  • Outdated mechanical and water treatment equipment
  • Loose and worn coping stones and paving joints
  • Lack of a modern automatic safety cover
  • Requirement to preserve the existing stonework and Cotswold character
  • Strict three-month project programme

Rather than treating each problem individually, the project was approached as a comprehensive swimming pool refurbishment.


Analysis

1. Fibreglass to Liner Pool Conversion

One of the most significant elements of the refurbishment was the conversion of the existing fibreglass swimming pool into an on-site welded liner pool.

The existing fibreglass shell was retained and carefully prepared and adapted to accommodate the new liner system.

This approach provided an effective alternative to completely removing and replacing the existing swimming pool.

An on-site welded liner was selected because it could be tailored precisely to the dimensions and features of the existing pool.

The system provided:

  • A completely renewed internal pool finish
  • Reliable waterproofing
  • A high-quality contemporary appearance
  • Long-term durability
  • The ability to adapt to the existing pool structure
  • Reduced disruption compared with complete pool replacement

The conversion effectively gave the existing swimming pool a new lease of life while making use of the original structure.


2. Mechanical & Water Treatment Systems

The existing pool plant equipment was also ageing and no longer provided the level of performance expected from a modern swimming pool.

As part of the refurbishment, the plant room equipment was comprehensively upgraded.

Works included:

  • Replacement of the swimming pool pump to improve circulation
  • Installation of a new filtration system to improve water clarity
  • Addition of a UV unit to assist with water treatment and reduce chemical demand
  • Installation of a new chlorinator to provide controlled and consistent sanitation

Together, these improvements significantly enhanced water quality, circulation, operational efficiency and the overall reliability of the pool.


3. Stonework Restoration

Preserving the character of the existing pool area was an important part of the project.

Rather than unnecessarily replacing the existing stonework, a restoration-led approach was adopted.

Works included:

  • Carefully lifting the existing coping stones
  • Preparing the underlying areas before relaying the copings
  • Relaying and securing the existing stone
  • Regrouting the pool copings
  • Regrouting areas of the surrounding paving
  • Retaining original materials wherever practical

This approach maintained the established Cotswold appearance of the pool area while improving the quality and longevity of the finished surround.

It also reduced unnecessary material waste by retaining and reusing suitable existing materials.


4. Automatic Safety Cover

The refurbishment provided an opportunity to considerably improve the safety and efficiency of the swimming pool.

A purpose-built cover pit was incorporated into the pool works to accommodate a new automatic safety cover.

The automatic cover provides several benefits, including:

  • Improved pool safety
  • Reduced heat loss
  • Reduced evaporation
  • Reduced debris entering the pool
  • Improved energy efficiency
  • Easier day-to-day pool management

Integrating the cover system as part of the wider refurbishment allowed it to become a considered part of the finished pool rather than a later addition.


5. Project Coordination

The entire refurbishment was completed within a strict three-month programme with no delays.

Achieving this required careful coordination of the different elements of the project, particularly as the works involved modifications to the existing pool structure alongside mechanical, waterproofing, stonework and finishing works.

Successful delivery required:

  • Careful planning before works commenced
  • Coordination between specialist trades
  • Correct sequencing of the fibreglass-to-liner conversion
  • Coordination of new plant and pool equipment
  • Careful management of the existing stonework
  • Efficient installation of the automatic cover system
  • Close on-site project management throughout the refurbishment

This allowed the project to progress efficiently from the initial strip-out through to final commissioning and completion.


Results / Outcomes

The completed refurbishment successfully transformed an ageing fibreglass swimming pool into a modern, attractive and efficient liner pool.

Key outcomes included:

  • Successful conversion from a fibreglass swimming pool to an on-site welded liner pool
  • Existing pool structure retained and given a new lease of life
  • New durable and watertight internal liner finish
  • Completely upgraded pool plant and water treatment equipment
  • Improved circulation, filtration and water quality
  • Existing Cotswold stone copings successfully retained and restored
  • Surrounding paving repaired and regrouted
  • New automatic safety cover and integrated cover pit
  • Improved safety and thermal efficiency
  • Significant improvement to the appearance and usability of the pool
  • Project completed within three months with no delays

Conclusion

This project demonstrates how an ageing fibreglass swimming pool can be successfully converted into a modern liner pool without the need for complete demolition and replacement.

By adapting and retaining the existing pool structure and installing a bespoke on-site welded liner, Clearwater was able to completely transform the internal appearance and waterproofing of the pool while extending its usable life.

The refurbishment went considerably further than the pool finish alone. Upgraded filtration, circulation, UV treatment and chlorination brought the pool's mechanical systems up to modern standards, while the addition of an automatic safety cover improved safety, heat retention and day-to-day usability.

Equally important was the sensitive restoration of the existing stone copings and paving. Retaining these materials ensured that, despite the extensive technical improvements, the finished pool remained entirely in keeping with the traditional Cotswold character of the property.

Completed within a strict three-month programme and without delays, the project demonstrates Clearwater's ability to take an ageing swimming pool and deliver a comprehensive refurbishment that combines structural adaptation, modern pool technology, specialist liner installation and sensitive restoration of existing materials.

 